返回
Construction spatial modeling and scheduling with three-dimensional singularity functions
DOI:10.1016/j.autcon.2014.03.008.png)
摘要
En 中文
Previous approaches for construction project scheduling have been limited to one dimension of time for bar charts and two dimensions for linear and repetitive scheduling approaches, which added a measure of work quantity. The question therefore arises if and how it is possible to derive a three-dimensional and ultimately multi-dimensional model. Reviewing mathematical theory finds that traditional functions lack the capability to express intervals for activities. Singularity functions are therefore chosen to newly derive stationary and directional activities in a Cartesian coordinate system, wherein the two dimensions of the floor plan area plus one dimension of time are explicitly modeled in an integrated manner. They are implemented into a conflict-avoiding heuristic scheduling algorithm that minimizes total project duration, which is computerized and validated with example calculations. (C) 2014 Elsevier B.V. All rights reserved.
Keyword:
Space planning
Constraints
Scheduling
Singularity functions
Mathematical modeling
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
引用论文
Two Synthetic Antibodies that Recognize and Neutralize Distinct Proteolytic Forms of the Ebola Virus Envelope Glycoprotein
ChemBioChem
IF0

