arrow
返回

Coordinated road-junction traffic control by dynamic programming

delete2005-09-01
delete45
delete
OA
AI
Т
Т.K. Ho
DOI:10.1109/TITS.2005.853713delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
This paper presents a novel approach to road-traffic control for interconnected junctions. With a local fuzzy-logic controller (FLC) installed at each junction, a dynamic-programming (DP) technique is proposed to derive the green time for each phase in a traffic-light cycle. Coordination parameters from the adjacent junctions are also taken into consideration so that organized control is extended beyond a single junction. Instead of pursuing the absolute optimization of traffic delay, this study examines a practical approach to enable the simple implementation of coordination among junctions, while attempting to reduce delays, if possible. The simulation results show that the delay per vehicle can be substantially reduced, particularly when the traffic demand reaches the junction capacity. The implementation of this controller does not require complicated or demanding hardware, and such simplicity makes it a useful tool for offline studies or real-time control purposes.
Keyword:
coordination
dynamic programming (DP)
fuzzy-logic control (FLC)
road-traffic control
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Intelligent Transportation Systems 封面图
IEEE Transactions on Intelligent Transportation Systems
IF:
8.4
论文数:
9.5K
被引数:
6.3W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
Evaluation of the Relative Plastic Work Factor During the Fatigue Test
err2015-01-01
err0
errOAAI
errA. Risitano; G. Fargione; F. Giudice; G. Patanè
err分享
err收藏
Effective interaction parameter between branched and linear polystyrene
err2001-09-19
err0
errOAAI
errC. C. Greenberg; M. D. Foster; C. M. Turner; S. Corona‐Galvan; E. Cloutet; R. P. Quirk; P. D. Butler; C. Hawker
err分享
err收藏
学者 查看更多内容