Cost-based scheduling method using object-oriented approach
DOI:10.1016/j.autcon.2016.01.007.png)
摘要
En 中文
Cost and schedule performances share common variables for effective project control. However, the real-world implementations of breakdown structures for cost and schedule are at different levels of detail, which makes the integration of cost and schedule information quite complex. Given the pressing need for an effective yet relatively easy-to-compile approach, this research proposes an innovative scheduling approach that enables contractors to develop a schedule based on the pay items in the contract during the tendering and construction phase. By using Microsoft Visual C#, a system with the proposed approach is implemented and, thus, pay items and schedule information are automatically integrated. A case study is investigated to demonstrate the merits of this system. The research shows a true synchronization between the cost and schedule functions and provides useful insights into future project planning and scheduling in construction projects. (C) 2016 Elsevier B.V. All rights reserved.
Keyword:
Cost-based
Scheduling
Object-oriented
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
引用论文
Chemical Characterization and Kinetic parameter determination under Rancimat test conditions of four monovarietal virgin olive oils grown in Morocco
OCL
IF0
没有更多内容