Critical path effect based delay analysis method for construction projects
DOI:10.1016/j.ijproman.2011.06.003.png)
摘要
En 中文
Assessing schedule delay's impact on total project duration to distribute delay liability remains a controversy. None of existing delay analysis methods is perfect because including an element of assumptions, subjective assessment and theoretical projection. Windows-based delay analysis methods are excellent in identifying and measuring construction schedule delays. Based on a previous study identifying potential problems in available windows-based delay analysis methods, this study proposes an innovative windows-based delay analysis method, called the effect-based delay analysis method (the EDAM method). The EDAM method performs delay analysis using extracted windows and determines delay impacts by considering the effects of delays on the critical path(s). According to its application to hypothetical cases and comparisons with other methods, the EDAM method is efficient in delay analysis and effective in solving concurrent delays and determining schedule shortened. The proposed EDAM method is a good alternative for schedule delay analysis for construction projects. (C) 2011 Elsevier Ltd. and IPMA. All rights reserved.
Keyword:
Delay analysis
Claim
Schedule analysis
Construction project
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.5
论文数:
2.6K
被引数:
1.4W