Daily windows delay analysis

delete2005-05-01
delete59
PRE
AI
T
Tarek Hegazy
K
Kehui Zhang
DOI:10.1061/(ASCE)0733-9364(2005)131:5(505)delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
Critical path method delay analysis techniques are widely applied in the construction industry, with the windows method being regarded as technologically advantageous. The approach looks at different schedule snapshots (windows) throughout the project and analyzes the contractor versus owner responsibility for delaying the critical paths. Accordingly, decisions regarding time and/or cost compensation could be made. While the technique is beneficial, it is computationally intensive and produces different results with different window sizes. Commercial software provide little support in this regard and the analysis is usually done manually. In this paper, a modified windows approach is introduced with computerized daily analysis of delays so that accurate and repeatable results are produced. The new approach is coupled with a new representation of progress information and is readily usable by professionals and researchers to evaluate project delays. Details of the daily analysis are introduced along with two case studies that demonstrate its advantages over the traditional windows approach. A downloadable version is made available for experimental use by researchers and professionals.
Keyword:
computer applications
construction management
information management
delay time
contractors
claims
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

Analysis of Adverse Weather for Excusable Delays
err2010-12-01
err28
PREAI
errNguyen, Long D.; Kneppers, Jax; de Soto, Borja Garcia; Ibbs, William
err分享
err收藏
err分享
err收藏
Concurrent Delays and Apportionment of Damages
err2011-02-01
err20
PREAI
errIbbs, William; Nguyen, Long D.; Simonian, Lonny
err分享
err收藏
Analysis of Causes of Delay and Time Performance in Construction Projects
err2014-01-01
err74
PREAI
errGonzalez, Pablo; Gonzalez, Vicente; Molenaar, Keith; Orozco, Francisco
err分享
err收藏
err分享
err收藏
Incorporating rework into construction schedule analysis
err2011-12-01
err42
PREAI
errHegazy, Tarek; Said, Mohamed; Kassab, Moustafa
err分享
err收藏

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.8W

机构

暂无机构信息
引用论文

引用论文

Rosmarinic acid treatment alleviates fibrotic changes in the myocardium induced in a rat model of insulin resistance
err2012-01-01
err0
errOAAI
errDhanapalan Karthik; Elumalai Arunkumar; Periasamy Viswanathan; Carani Venkatraman Anuradha
err分享
err收藏
Fog Harvesting
err2022-05-26
err0
PREAI
errRebecca L. Farnum
err分享
err收藏