Daily windows delay analysis
DOI:10.1061/(ASCE)0733-9364(2005)131:5(505).png)
摘要
En 中文
Critical path method delay analysis techniques are widely applied in the construction industry, with the windows method being regarded as technologically advantageous. The approach looks at different schedule snapshots (windows) throughout the project and analyzes the contractor versus owner responsibility for delaying the critical paths. Accordingly, decisions regarding time and/or cost compensation could be made. While the technique is beneficial, it is computationally intensive and produces different results with different window sizes. Commercial software provide little support in this regard and the analysis is usually done manually. In this paper, a modified windows approach is introduced with computerized daily analysis of delays so that accurate and repeatable results are produced. The new approach is coupled with a new representation of progress information and is readily usable by professionals and researchers to evaluate project delays. Details of the daily analysis are introduced along with two case studies that demonstrate its advantages over the traditional windows approach. A downloadable version is made available for experimental use by researchers and professionals.
Keyword:
computer applications
construction management
information management
delay time
contractors
claims
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。