返回
Deadline-based escalation in process-aware information systems
DOI:10.1016/j.dss.2006.11.005.png)
摘要
En 中文
Decision making in process-aware information systems involves build-time and run-time decisions. At build-time, idealized process models are designed based on the organization's objectives, infrastructure, context, constraints, etc. At run-time, this idealized view is often broken. In particular, process models generally assume that planned activities happen within a certain period. When such assumptions are not fulfilled, users must make decisions regarding alternative arrangements to achieve the goal of completing the process within its expected time frame or to minimize tardiness. We refer to the required decisions as escalations. This paper proposes a framework for escalations that draws on established principles from the workflow management field. The paper identifies and classifies a number of escalation mechanisms such as changing the routing of work, changing the work distribution or changing the requirements with respect to available data. A case study and a simulation experiment are used to illustrate and evaluate these mechanisms. (c) 2006 Elsevier B.V All rights reserved.
Keyword:
process-aware information systems
workflow management
deadline escalation
resource allocation
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6.8
论文数:
3.8K
被引数:
1.5W
机构
暂无机构信息
引用论文
The Change of pH Value and Octolasion cyaneum Savigny Earthworms’ Activity under Stubble Crops after Spring Triticale Continuous Cultivation
Soil Systems
IF0

