Decision-making in tunneling using artificial intelligence tools
DOI:10.1016/j.tust.2020.103514.png)
摘要
En 中文
Given the frequent cost overruns and schedule delays associated with tunnel construction projects, it is imperative that a detailed estimation of both be developed and considered prior to starting construction. To this end, two artificial intelligence tools of Gaussian Process Regression (GPR) and Support Vector Regression (SVR) were used to forecast geology, construction time and construction costs of a road tunnel project. The initial training datasets applied in the prediction tools were accessed from the previously-constructed road tunnels and the pre-existing observations of the tunnel under consideration. Also, during the tunnel construction, more training datasets obtained in the constructed parts were added to the previous datasets and the pre-constructed predictions of the GPR and SVR tools were updated. Lastly, comparing the predictions made by the GPR and SVR tools with the actual mode of the tunnel, and comparing the pre-updating predictions with the post-updating ones, it was concluded that, the GPR and SVR tools have presented very good predictions and they have reduced the uncertainties regarding geology and construction time and costs to an acceptable level. But, the GPR tool has presented more accurate results than the SVR tool. Also, the updating procedure can significantly increase the predictions accuracy.
Keyword:
Road tunnels
Gaussian process regression
Support vector regression
Geology
Construction time and costs
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.4
论文数:
7.0K
被引数:
3.5W
机构
引用论文
Prediction of rock burst classification using the technique of cloud models with attribution weight
NATURAL HAZARDS
IF3.7
Transitional markov chain monte carlo method for Bayesian model updating, model class selection, and model averaging用于贝叶斯模型更新,模型类选择和模型平均的过渡马尔可夫链蒙特卡洛方法