Deformation Process of Shallow-Buried Tunnel Surrounding Rocks Subjected to Blasting via In Situ 3D-DIC Measurements

delete2026-08-13
delete0
delete
OA
AI
L
Lijun Wu
M
Min Gong *
H
Haojun Wu
X
Xiaodong Wu
J
Jing Pan
DOI:10.3390/pr14162579delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This study devised a blasting experiment to establish a dynamic quantified relationship between blasting and movement, failure, and ejection of rock masses. The experiment was conducted using the 3D digital image correlation method (3D-DIC), which provided high-speed images capturing the process of shallow-buried tunnel blasting. The study analyzed the mechanical behavior of full-section rock mass under blasting action through cross-scale image processing. Yield and elastic points were distinguished based on the time–displacement curve. Then, the spatial vector method was employed to deduce flying rock trajectory and throwing distance, enabling the subdivision of underground space based on risk assessment. The results show that the rock in the cut zone starts moving within 3 ms after initiation, ultimately exhibiting a maximum visible off-plane displacement of 215 mm. Displacements are related to delay time and distance. Different zones show distinct dominant directions of rock mass displacement. The rock mass becomes flying rocks separated from the cross-section. The initial velocity of the flying rocks ranges from 11.8 m·s−1 to 29.9 m·s−1. Around 85% of the flying rocks fall within the range of 0 to 40.8 m. Only 5% of the flying rocks fall outside 64.3 m. Appropriate protective measures should be taken for equipment during experiments.
Keywords:
blasting process
safety process
rock deformation
displacement
flying rock

Journal

Processes cover
Processes
IF:
2.8
Papers:
6.6K
Citations:
3.7W

Organization

U
university of science and technology beijing
Scholars:
1.1W
Papers: 4.0K
Citations: 2
Cited Papers

Cited Papers

Citing Papers

Citing Papers