arrow
返回

Delay analysis and optimization for inter-core interference in real-time embedded multicore systems

delete2017-05-01
delete1
PRE
AI
Z
Zhihua Gan *
M
Mingquan Zhang
Z
Zhimin Gu
H
Hai Tan
J
Jizan Zhang
DOI:10.1016/j.jpdc.2016.12.004delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The Worst Case Execution Time (WCET) is one of the most important performance metrics in real-time systems. With multi-core architectures becoming a trend in real-time systems, the WCET analysis is of great challenge, since multiple cores accessing shared hardware resources, such as cache and bus, may result in significant interference on them. In this paper, we propose a finer gained approach to analyze the inter-core interference(bank conflict and bus access interference) on multi-core platforms with the interference-aware bus arbiter(IABA) and bank-column cache partitioning, and our approach can reasonably estimate interference delays based on request timing. Moreover, we optimize bank-to-core mapping to reduce the interference delays, and develop an algorithm for finding the best bank-to core mapping. The experimental results show that our interference analysis approach can improve the tightness of interference delays by 1836% on average compared to Upper Bound Delay(UBD) approach, and the optimized bank-to-core mapping can achieve the WCET improvement by 8.93% on average. (C) 2016 Elsevier Inc. All rights reserved.
Keyword:
Multi-core
WCET
Inter-core interference
Bank conflict

期刊

Journal of Parallel and Distributed Computing 封面图
Journal of Parallel and Distributed Computing
IF:
4
论文数:
3.8K
被引数:
4.8K

机构

B
beijing institute of technology
学者数:
5.5W
论文数: 4.0W
被引数: 63
引用论文

引用论文

I Micro Fresnel Lenses
err1987-01-01
err0
PREAI
errH. Nishihara; T. Suhara
err分享
err收藏
Numerical simulation of coronal heating by resonant absorption of Alfv�n waves
err1989-01-01
err0
PREAI
errStefaan Poedts; Marcel Goossens; Wolfgang Kerner
err分享
err收藏
Phase-Change Memory Optimization for Green Cloud with Genetic Algorithm
err2015-12-01
err255
PREAI
errQiu, Meikang; Ming, Zhong; Li, Jiayin; Gai, Keke; Zong, Ziliang
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
学者 查看更多内容