arrow
返回

Delay Analysis in IoT Sensor Networks

delete2021-06-04
delete7
delete
OA
AI
A
Asaad Althoubi
R
Reem Alshahrani
H
Hassan Peyravi *
DOI:10.3390/s21113876delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Internet of Things (IoT) devices, particularly those used for sensor networks, are often latency-sensitive devices. The topology of the sensor network largely depends on the overall system application. Various configurations include linear, star, hierarchical and mesh in 2D or 3D deployments. Other applications include underwater communication with high attenuation of radio waves, disaster relief networks, rural networking, environmental monitoring networks, and vehicular networks. These networks all share the same characteristics, including link latency, latency variation (jitter), and tail latency. Achieving a predictable performance is critical for many interactive and latency-sensitive applications. In this paper, a two-stage tandem queuing model is developed to estimate the average end-to-end latency and predict the latency variation in closed forms. This model also provides a feedback mechanism to investigate other major performance metrics, such as utilization, and the optimal number of computing units needed in a single cluster. The model is applied for two classes of networks, namely, Edge Sensor Networks (ESNs) and Data Center Networks (DCNs). While the proposed model is theoretically derived from a queuing-based model, the simulation results of various network topologies and under different traffic conditions prove the accuracy of our model.
Keyword:
sensor networks
edge networks
data center networks
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Sensors 封面图
Sensors
IF:
3.5
论文数:
7.2W
被引数:
20.9W

机构

K
Kent State University
学者数:
2.7K
论文数: 2.3K
被引数: 6.6K
U
University System of Ohio
学者数:
15.5W
论文数: 13.0W
被引数: 200
引用论文

引用论文

The Nup62 Coiled-Coil Motif Provides Plasticity for Triple-Helix Bundle Formation
err2017-04-26
err0
PREAI
errPravin S. Dewangan; Parshuram J. Sonawane; Ankita R. Chouksey; Radha Chauhan
err分享
err收藏
Neural stem cells improve neuronal survival in cultured postmortem brain tissue from aged and Alzheimer patients
err2008-10-15
err0
errOAAI
errL. Wu; A. A. Sluiter; Ho‐fu Guo; R. A. Balesar; D. F. Swaab; Jiang‐Ning Zhou; R. W. H. Verwer
err分享
err收藏
Ninjurin1 Deletion in NG2-Positive Pericytes Prevents Microvessel Maturation and Delays Wound Healing
err2022-11-01
err0
errOAAI
errRisa Matsuo; Mari Kishibe; Kiwamu Horiuchi; Kohei Kano; Takamitsu Tatsukawa; Taiki Hayasaka; Maki Kabara; Shin Iinuma; Ryoji Eguchi; Satomi Igawa; Naoyuki Hasebe; Akemi Ishida-Yamamoto; Jun-ichi Kawabe
err分享
err收藏
err分享
err收藏
Effect of Serum, Cholesterol and Low Density Lipoprotein on the Functionality and Structure of Lung Surfactant Films
err2014-01-01
err0
errOAAI
errPrasant Nahak; Kaushik Nag; Ashley Hillier; Ravi Devraj; David W. Thompson; Kausik Manna; Kimiko Makino; Hiroyuki Ohshima; Hiromichi Nakahara; Osamu Shibata; Amiya Kumar Panda
err分享
err收藏
Amdahl's Law for Tail Latency
err2018-07-23
err42
PREAI
errDelimitrou, Christina; Kozyrakis, Christos
err分享
err收藏
Analytics for the Internet of Things: A Survey物联网分析: 一项调查
err2018-07-25
err134
errOAAI
errSiow, Eugene; Tiropanis, Thanassis; Hall, Wendy
err分享
err收藏
Rethinking Fast and Friendly Transport in Data Center Networks
err2020-10-01
err23
PREAI
errZhang, Tao; Huang, Jiawei; Chen, Kai; Wang, Jianxin; Chen, Jianer; Pan, Yi; Min, Geyong
err分享
err收藏
学者 查看更多内容