1
Return

Designing a circular supply chain network for electric vehicle batteries: An improved robust possibilistic programming approach

delete2026-04-17
delete0
PRE
AI
A
AmirMohammad Ahmadi Nezhad
S
S. Ali Torabi *
A
Amir Ghasemi
DOI:10.1016/j.ijpe.2026.110043delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
• Developing a robust Circular SCND model integrating remanufacturing, recycling, and repurposing for EVBs. • Leveraging CRM-based return rate modelling into the CSCND model. • Proposing an improved version of RPP approach to address nonlinearities in the resulting RPP model. • Providing practical insights through a real-world case study focused on Tesla EVBs.
Keywords:
Circular Supply Chain Network
Electric Vehicle Batteries
Remanufacturing
Recycling
Robust Possibilistic Programming

Journal

International Journal of Production Economics cover
International Journal of Production Economics
IF:
10
Papers:
7.9K
Citations:
3.6W

Organization

U
University of Tehran
Scholars:
2.4W
Papers: 2.3W
Citations: 2.7W
M
Merck KGaA
Scholars:
75
Papers: 28
Citations: 0
Cited Papers

Cited Papers

Citing Papers

Citing Papers