返回
摘要
En 中文
In this paper, alternative assembly line design strategies for a single product are discussed. The problem occurs when the production volume is substantially high and there are more operators needed than the number of assembly operations. The objective is to determine the number of assembly lines with minimum total manpower. It is allowed to have multiple assembly lines with identical configuration. A 3-phase methodology is proposed; 1) assembly line balancing, 2) determining parallel stations, 3) determining parallel lines. Later, the proposed procedure is illustrated with a numerical example. (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
Keyword:
assembly line balancing
parallel stations
parallel lines
mathematical modeling
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6.5
论文数:
1.0W
被引数:
3.8W
机构
暂无机构信息

