返回
Developing a knowledge map for construction scheduling using a novel approach
DOI:10.1016/j.autcon.2007.02.005.png)
摘要
En 中文
A knowledge map is a vital tool for better knowledge management and learning. While application of knowledge maps in the construction domain remains in the initial stages of development, the construction industry is experience-oriented and therefore suited to knowledge maps. This study presents a novel approach for developing a knowledge map for construction scheduling. According to framework-based classification, this study utilizes a science-specific search engine to search for literature on construction scheduling knowledge. Search results are then used to develop a file cabinet knowledge map consisting of a contour map, and several trend and density charts. This map representation compensates for the lack of various meanings in a single knowledge map. For novices interested in learning construction scheduling knowledge, results of this study provide constructive information to know the key issues and research trends in the construction domain. In summary, this study presents a suitable procedure for extracting knowledge from public knowledge sources for development of a knowledge map. The proposed approach can be used for rapid generation of knowledge maps. (c) 2007 Elsevier B.V. All rights reserved.
Keyword:
knowledge map
knowledge management
construction management
scheduling technique
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
暂无机构信息
引用论文
Urothelial Dysfunction and Increased Suburothelial Inflammation of Urinary Bladder Are Involved in Patients with Upper Urinary Tract Urolithiasis – Clinical and Immunohistochemistry Study
PLoS ONE
IF0
Review:: Knowledge management and knowledge management systems:: Conceptual foundations and research issues评论:: 知识管理和知识管理系统:: 概念基础和研究问题
Low-Temperature Vacuum Evaporation of Ammonia from Pig Slurry at Laboratory and Pilot-Plant Scale
Processes
IF0

