arrow
返回

Developing a Model for Analyzing Risks Affecting Machinery Tunnel Execution

delete2023-07-11
delete3
delete
OA
AI
M
Mohamed A. Eid *
J
Jong Wan Hu *
U
Usama Hamed Issa
DOI:10.3390/buildings13071757delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Tunneling projects face several risks during the execution stage that affect the execution objectives (cost, time, quality, and safety). This study aimed to define the main execution activities of machinery tunnels with the associated risk factors and to develop a model for evaluating and analyzing the effects of the risk factors on the execution stage. The recognized activities of executing tunnels included the following: (A01) thrust and reception shaft installation; (A02) machine setup and break-in; (A03) machine progression and lining placing; and (A04) machine break-out and removal. Additionally, thirty-two risk factors associated with these activities were identified. Risk factor probability of occurrence and impacts on cost, time, quality, and safety were determined. Due to this risky and uncertain environment, the fuzzy logic method was applied for developing a model to analyze the effects of the risks on the tunneling process. The model was applied and verified using data collected in Egypt. Many correlations were determined among risk factors that affected tunneling execution objectives, resulting in close relationships with each other. The results emphasized many significant risk factors, such as conflict between technical geological report and the ground nature, and shaft wall damage during break-out. A03, which is related to machine progression and lining placing, was declared the riskiest activity group during tunneling execution. Further, safety was rated as the objective most affected by risks. The risk model presented in this study can be modified and applied to other cases, while the results and key risks can support the decision-makers who deal with tunneling construction.
Keyword:
machinery tunnel
tunneling project
risk analysis
fuzzy logic

期刊

Buildings 封面图
Buildings
IF:
3.1
论文数:
1.8W
被引数:
2.5W

机构

M
minia university
学者数:
2.6K
论文数: 2.4K
被引数: 0
E
egyptian knowledge bank (ekb)
学者数:
11.6W
论文数: 9.3W
被引数: 84
I
incheon national university
学者数:
4.0K
论文数: 4.3K
被引数: 4
学者 查看更多机构
引用论文

引用论文

An Integrated Quantitative Risk Assessment Method for Urban Underground Utility Tunnels
err2021-09-01
err50
PREAI
errWu, Jiansong; Bai, Yiping; Fang, Weipeng; Zhou, Rui; Reniers, Genserik; Khakzad, Nima
err分享
err收藏
err分享
err收藏
学者 查看更多内容