DEVELOPING AS-BUILT BIM MODEL PROCESS MANAGEMENT SYSTEM FOR GENERAL CONTRACTORS: A CASE STUDY

delete2015-08-24
delete21
delete
OA
AI
Y
Yu‐Cheng Lin *
H
Hsin-Yun Lee
I
I‐Tung Yang
DOI:10.3846/13923730.2014.914081delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
As the application of building information modeling (BIM) becomes more common, BIM model management becomes necessary and important to enhance the effectiveness of BIM implementation for a general contractor (GC) during the construction phase. Implementation of BIM models in the construction phase, which typically involves participants from different fields, often has numerous BIM-related interfaces and problems. Therefore, feedback from the most recent as-built model tracking and BIM model problems are essential for BIM process management (BIM PM) in the construction field. BIM PM has become the most important aspect of a sound as-built BIM model management strategy. Changes in as-built BIM models should be identified, updated, and tracked for BIM PM, such that version management of as-built BIM models can be improved, while minimizing rework and reducing as-built BIM models development duration. Systematic approaches and information on management platforms for enhancing BIM PM during the construction phase are lacking. This study proposes a novel approach to the BIM model management which is to manage and track all versions of as-built BIM models. The primary purpose of this study is to develop a web Construction BIM-based PM (ConBIM-PM) system to enhance a General Contractor's ability to share BIM PM information and track construction projects more efficiently. The ConBIM-PM system provides users with a centralized storage of all versions of as-built models during the construction phase of a project so that they are able to track and manage the current status of modified as-built models and BIM PM information effectively. Finally, the ConBIM-PM system is applied to a case study of a building project in Taiwan to verify its efficacy and demonstrate its effectiveness. The case study results show that the ConBIM-PM system is effective for BIM PM work by a GC during the construction phase of the BIM implementation.
Keyword:
BIM
process management
building information modeling
information system
web-based system
BIM management
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Management in Engineering
IF:
7
论文数:
3.1K
被引数:
6.8K

机构

N
national taiwan university of science & technology
学者数:
8.8K
论文数: 8.7K
被引数: 9
N
National Taipei University of Technology
学者数:
7.1K
论文数: 7.3K
被引数: 6.8K
N
national i-lan university
学者数:
992
论文数: 1.3K
被引数: 0
学者 查看更多机构
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Analysis of modeling effort and impact of different levels of detail in building information models
err2011-08-01
err154
PREAI
errLeite, Fernanda; Akcamete, Asli; Akinci, Burcu; Atasoy, Guzide; Kiziltas, Semiha
err分享
err收藏
Subsurface Application Enhances Benefits of Manure Redistribution
err2016-02-01
err0
errOAAI
errJian Liu; Peter J. A. Kleinman; Douglas B. Beegle; Curtis J. Dell; Tamie L. Veith; Lou S. Saporito; Kun Han; Dan H. Pote; Ray B. Bryant
err分享
err收藏
Aligning building information model tools and construction management methods
err2012-03-01
err172
PREAI
errHartmann, Timo; van Meerveld, Hendrik; Vossebeld, Niels; Adriaanse, Arjen
err分享
err收藏
学者 查看更多内容