返回
Distributed multiproject resource control: A market-based approach
DOI:10.1016/S0007-8506(07)61538-8.png)
摘要
En 中文
The multiple project resource-scheduling problems extend job-shop scheduling problems by allowing for task dependency and multiple entities trying to maximize their own requirements fulfillment. In this paper we deal with decentralized scheduling of resources, which are shared by multiple projects. In specific, we address the dynamic nature of the situation. We model this as a virtual economy (entities as buyers and sellers of resources), where the resource-time slots (resource availability over a given time) are traded as goods. Due to the dynamic and distributed nature of the economy, through our approach we achieve higher levels of flexibility and scalability. In this paper, we discuss our virtual economy model and the market mechanism along with empirical analysis and results.
Keyword:
dynamic scheduling
distributed project management
project control
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

