Distributed scheduling model for infrastructure networks

delete2004-04-01
delete55
PRE
AI
T
Tarek Hegazy
A
Ahmed Elhakeem
E
Emad Elbeltagi
DOI:10.1061/(ASCE)0733-9364(2004)130:2(160)delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper presents an innovative model for scheduling, resource planning, and cost optimization of large construction and/or maintenance programs that involve multiple distributed sites. The proposed distributed scheduling model (DSM) employs an information system to store data related to various work sites, activities' optional construction methods, and available resources. The DSM also incorporates a scheduling algorithm that is resource focused, and maintains crew work continuity under any sequence of distributed sites. To minimize cost and meet project time and resource constraints, the DSM uses genetic algorithms to determine the optimum set of construction methods and the optimum routing order among sites. Details of the DSM formulation are presented in this paper and the benefits to municipalities and contractors are outlined.
Keyword:
computer applications
construction management
algorithms
optimization
scheduling
infrastructure
cost control
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
Survey on the presence of A. simplex s.s. and A. pegreffii hybrid forms in Central-Western Mediterranean Sea
err2016-12-01
err0
PREAI
errAntonella Costa; Gaetano Cammilleri; Stefania Graci; Maria Drussilla Buscemi; Mirella Vazzana; Deborah Principato; Giuseppe Giangrosso; Vincenzo Ferrantelli
err分享
err收藏
没有更多内容