Distributed scheduling model for infrastructure networks
DOI:10.1061/(ASCE)0733-9364(2004)130:2(160).png)
摘要
En 中文
This paper presents an innovative model for scheduling, resource planning, and cost optimization of large construction and/or maintenance programs that involve multiple distributed sites. The proposed distributed scheduling model (DSM) employs an information system to store data related to various work sites, activities' optional construction methods, and available resources. The DSM also incorporates a scheduling algorithm that is resource focused, and maintains crew work continuity under any sequence of distributed sites. To minimize cost and meet project time and resource constraints, the DSM uses genetic algorithms to determine the optimum set of construction methods and the optimum routing order among sites. Details of the DSM formulation are presented in this paper and the benefits to municipalities and contractors are outlined.
Keyword:
computer applications
construction management
algorithms
optimization
scheduling
infrastructure
cost control
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
暂无机构信息
引用论文
Mycorrhizal fungi induced activation of tomato defense system mitigates Fusarium wilt stress菌根真菌诱导番茄防御系统的激活减轻了枯萎病胁迫
Measuring Heart Rate Variability in Free-Living Conditions Using Consumer-Grade Photoplethysmography: Validation Study使用消费级光电容积描记法测量自由生活条件下的心率变异性: 验证研究
Extractable phosphorus in alkaline soils amended with high rates of organic and inorganic phosphorus用高比率的有机和无机磷修正的碱性土壤中的可提取磷
没有更多内容