DSS FOR MULTIOBJECTIVE PROJECT SCHEDULING
DOI:10.1016/0377-2217(94)90353-0.png)
摘要
En 中文
The paper presents a decision support system (DSS) for multiobjective project scheduling under multiple-category resource constraints. It handles quite a general class of nonpreemptive scheduling problems with renewable, nonrenewable and doubly-constrained resources, multiple performing modes of activities, precedence constraints in the form of an activity network and multiple project performance criteria of time and cost type. The DSS is based on three kinds of heuristics: parallel priority rules, simulated annealing and branch-and-bound. The last algorithm can even yield exact solutions when sufficient processing time is available. Some parts of the system are interactive, in particular, the search for the best compromise schedule. Graphical facilities enable a thorough evaluation of feasible schedules. Methodological foundations of the system and the algorithms used in the calculation phase are first explained. Then, a functional description of the system is made. The last part presents results of three test problems, in particular, an agricultural problem including 30 activities, multiple objectives and multiple-category resources.
Keyword:
DECISION SUPPORT SYSTEM
PROJECT SCHEDULING
MULTIPLE OBJECTIVES
INTERACTIVE METHOD
SIMULATED ANNEALING
AGRICULTURAL PROJECT
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
暂无机构信息
引用论文
没有更多内容