arrow
返回

Dynamic construction material layout planning optimization model by integrating 4D BIM

delete2018-07-09
delete38
PRE
AI
M
Min–Yuan Cheng
N
Nai-Wen Chang *
DOI:10.1007/s00366-018-0628-0delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Construction material layout planning is a key project in temporary facility layouts. When allocating materials without effective resource consolidation and planning in advance, construction managers usually have difficulties in comprehensively determining resource demand to optimize material layout. This also leads to reduced efficiency, increased cost, and unnecessary loss of time. This study proposed the dynamic construction material layout planning optimization model to investigate the optimization of material layout from the perspective of dynamic task scheduling. In addition to the variables of schedule advancement and evolution, dynamic material requirements, and changes in storage sites and areas, task float times were analyzed to account for the changes in three-dimensional travel distances between material supply and demand sites concurrently with changes in task schedules and ensure that the observations conformed to real-time conditions. First, schedule and building information modeling techniques as well as the procedures for quantity take-off and construction materials and quantity analysis were consolidated to produce dynamic material requirements data for construction layout planning. Second, the symbiotic organisms search algorithm was applied to derive the optimized construction site material layout plan. Finally, the proposed model was applied to a construction project. The required total distance for the dynamic material layout plan was 954,736m, which saved roughly half of the required distance compared with the fixed material layout plan of 1,659,457m. This greatly reduced material transportation costs and validated the effectiveness of the proposed model.
Keyword:
Layout optimization
Dynamic material site layout planning
Building information model
Artificial intelligence
Symbiotic organism search
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Engineering with Computers 封面图
Engineering with Computers
IF:
4.9
论文数:
2.7K
被引数:
9.3K

机构

N
national taiwan university of science & technology
学者数:
8.8K
论文数: 8.7K
被引数: 9
引用论文

引用论文

Molecular evolution of IRG1 shapes itaconate production in metazoans and alleviates the “double-edged dilemma” of innate immune defense
err
IF0
err2022-06-19
err0
errOAAI
errRichard V. Szeligowski; Francois Miros; Andres Saez; Marisa DeCiucis; Gunter P. Wagner; Hongying Shen
err分享
err收藏
err分享
err收藏
err分享
err收藏
Aligning building information model tools and construction management methods
err2012-03-01
err172
PREAI
errHartmann, Timo; van Meerveld, Hendrik; Vossebeld, Niels; Adriaanse, Arjen
err分享
err收藏
Using behavioural insights to reduce sugar in primary school children's packed lunches in derby; A cluster randomised controlled trial
err2021-02-01
err0
errOAAI
errAmanda Bunten; Lucy Porter; Jilla Burgess-Allen; Rebecca Howell-Jones; Jessica Jackson; Derek Ward; Vicki Staples; Paul Staples; Harriet Rowthorn; Ayoub Saei; Paul van Schaik; Elizabeth Tydeman; Penny Blair; Orla Hugueniot; Natalie Gold; Tim Chadborn
err分享
err收藏
err分享
err收藏
Editorial
err2008-06-28
err0
PREAI
errJames P Smith
err分享
err收藏
学者 查看更多内容