返回
Dynamic scheduling for complex engineer-to-order products
DOI:10.1080/00207540600767772.png)
摘要
En 中文
The current paper considers dynamic production scheduling for manufacturing systems producing products with deep and complex product structures and complicated process routings. It is assumed that manufacturing and assembly processing times are deterministic. Dynamic scheduling problems may be either incremental (where the schedule for incoming orders does not affect the schedule for existing orders) or regenerative (where a new schedule is produced for both new and existing orders). In both situations, a common objective is to minimize total costs (the sum of work-in-progress holding costs, product earliness and tardiness costs). In this research, heuristic and evolutionary-strategy-based methods have been developed to solve incremental and regenerative scheduling problems. Case studies using industrial data from a company that produces complex products in low volume demonstrate the effectiveness of the methods. Evolution strategy (ES) provides better results than the heuristic method, but this is at the expense of significantly longer computation times. It was found that performing regenerative planning is better than incremental planning when there is high interaction between the new orders and the existing orders.
Keyword:
dynamic scheduling
engineer to order
rescheduling
optimization
evolution strategy
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.1W
被引数:
3.7W
机构
暂无机构信息

