arrow
返回

Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes

delete1998-10-15
delete454
PRE
AI
I
Ierapetritou, MG
C
Christodoulos A. Floudas *
DOI:10.1021/ie970927gdelete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
During the last decade, the problem of production scheduling has been realized to be one of the most important problems in industrial plant operations especially when multipurpose/multiproduct batch processes are involved. This paper presents a novel mathematical formulation for the short-term scheduling of batch plants. The proposed formulation is based on a continuous time representation and results in a mixed integer linear programming (MILP) problem. The novel elements of the proposed formulation are (i) the decoupling of the task events from the unit events, (ii) the time sequencing constraints, and (iii) its linearity. In contrast to the previously presented continuous-time scheduling formulations, the proposed approach leads to smaller and simpler mathematical models which exhibit fewer binary and continuous variables, have smaller integrality gaps, require fewer constraints, need fewer linear programming relaxations, and can be solved in significantly less CPU time. Several examples are presented that illustrate the effectiveness of the proposed formulation, and comparisons with other approaches are provided.
Keyword:
PARALLEL SEMICONTINUOUS PROCESSES
GENERAL ALGORITHM
OPERATIONS
PLANTS

期刊

I
Industrial and Engineering Chemistry Research
IF:
3.9
论文数:
4.0W
被引数:
9.6W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
err分享
err收藏
没有更多内容