This paper proposes a heuristic algorithm for integrated scheduling of refinery production unit operations and finished product blending and delivery operations. To apply the proposed iterative algorithm, the integrated oil-refinery scheduling problem is decomposed into a production unit scheduling problem and a finished product blending and delivery scheduling problem. The goal of the algorithm is to obtain a feasible solution that satisfies product demand commitments with minimum demurrage violations while minimizing run-mode changeover cost, inventory cost, and penalties subject to product and logistics giveaways. The proposed algorithm provides a feasible solution at the end of each iteration, and to obtain solution without demurrage violations, a set of integer cuts are generated at the end of an iteration to eliminate current task assignment sequence for a multipurpose blend unit. The applicability of the algorithm is illustrated by a realistic large-scale refinery case study producing diesel and jet fuel. Significant savings are realized in the computational effort.
Keyword:
CONTINUOUS-TIME FORMULATION
MULTIMILLION-DOLLAR BENEFITS
LINEAR-PROGRAMMING MODEL
CRUDE-OIL BLENDSHOP
MIXED-INTEGER
RECIPE DETERMINATION
BLENDING OPERATIONS
OPTIMIZATION
ABILITY
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

I
Industrial and Engineering Chemistry Research
IF:
3.9
论文数:
4.0W
被引数:
9.6W

机构

R
rutgers university system
学者数:
4.1W
论文数: 3.7W
被引数: 53
引用论文

引用论文

err分享
err收藏
A planning model for refinery diesel production
err1998-03-01
err104
PREAI
errMoro, LFL; Zanin, AC; Pinto, JM
err分享
err收藏
err分享
err收藏
学者 查看更多内容