The single-item lot sizing problem under a periodic energy limitation is considered in this paper. Identical and parallel capacitated machines constitute the production system, each one consuming a certain amount of energy when being switched on, when reserved, and when producing. We consider a cost for starting-up the machines, a reservation cost to keep the machines ready for production, in addition to classical lot sizing costs, such as, joint setup cost, unit production cost and unit holding cost, all being time-dependent. Besides the classical lot sizing decisions of how much and in which periods to produce, we have to decide the number of machines to switch on and to switch off in each period. We show that this problem is NP-hard even under restricted conditions. In contrast, assuming stationary energy parameters, we propose two polynomial time dynamic programming algorithms to solve the problem to optimality. The first algorithm is proposed for the case with null setup cost, null reservation cost and null reservation energy consumption, and runs in O ((MT4)-T-5) time, with M being the number of machines and T the number of periods. We show that we can extend this algorithm to solve the generalized version of the problem in time complexity O ((MT6)-T-6).
Keyword:
Lot sizing problem
Energy
Capacitated parallel machines
Polynomial time algorithm
Complexity
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Economics 封面图
International Journal of Production Economics
IF:
10
论文数:
8.0K
被引数:
3.6W

机构

U
universite de lorraine
学者数:
1.8W
论文数: 1.4W
被引数: 27
引用论文

引用论文

Lot-sizing in a multi-stage flow line production system with energy consideration
err2016-07-07
err45
PREAI
errMasmoudi, Oussama; Yalaoui, Alice; Ouazene, Yassine; Chehade, Hicham
err分享
err收藏
Including energy in supply chain planning at a pulp company
err2013-12-01
err16
PREAI
errWaldemarsson, Martin; Lidestam, Helene; Rudberg, Martin
err分享
err收藏
err分享
err收藏
Single item lot sizing problems单项批量问题
err2006-01-01
err237
PREAI
errBrahimi, N; Dauzere-Peres, S; Najid, NM; Nordli, A
err分享
err收藏
err分享
err收藏
学者 查看更多内容