Estimating performance time for construction projects
DOI:10.1061/(ASCE)0742-597X(2007)23:4(193).png)
摘要
En 中文
The prediction of performance time for construction projects is a problem of interest to both researchers and practitioners. This research seeks to gain insight into the significant factors impacting construction duration by developing a regression model. Data were collected for 856 facility projects completed between 1988 and 2004. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. The multiple linear regression model was found to provide the most acceptable prediction. As in the BTC model and previous research reported in the literature, a significant correlation was found to exist between cost and duration. However, several other factors were also identified that resulted in significantly lower than average construction durations. These include projects completed within certain management groupings, managed by a certain construction agent, and designed by in-house personnel.
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
7
论文数:
3.1K
被引数:
6.8K
机构
暂无机构信息
引用论文
没有更多内容