返回
Evaluating software project portfolio risks
DOI:10.1016/j.jss.2006.03.038.png)
摘要
En 中文
As in any other business, software development organizations try to maximize their profits and minimize their risks. The risks represent uncertain events and conditions that may prevent enterprises from attaining their goals, turning risk management into a major concern, not only for project managers but also for executive officers involved with strategic objectives. In this sense, economical concepts can greatly support Software Engineers in the effort to better quantify the uncertainties of either a single project or even a project portfolio. In this paper, we present a technique for evaluating risk levels in software projects through analogies with economic concepts. This technique allows a manager to estimate the probability distribution of earnings and losses incurred by an organization in relation to its software project portfolio. This approach has been calibrated by data collected in an empirical study, which has been planned and accomplished to provide information about the relative importance of risk factors in software projects. A usage example of such an approach is presented. Finally, we introduce a case tool specially built to support the application of the proposed techniques. (C) 2006 Elsevier Inc. All rights reserved.
Keyword:
software project management
software risk management
software engineering economics
empirical studies
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.1
论文数:
5.4K
被引数:
8.4K
机构
暂无机构信息
引用论文
Continuous operation of commercial-scale plasma–chemical aftertreatment system of smoke tube boiler emission with oxidation reduction potential and pH control具有氧化还原电位和pH控制的烟管锅炉排放的商业规模等离子体化学后处理系统的连续运行
没有更多内容

