arrow
返回

Expected response times for closed-loop multivehicle AMHS

delete2007-10-01
delete13
PRE
AI
D
Dima Nazzal *
L
Leon F. McGinnis
DOI:10.1109/TASE.2007.906141delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
We present an analytical approach for estimating the expected time for an automated material handling system (AMHS) to respond to move requests at loading stations in a vehicle-based, unidirectional, closed-loop AMHS. The expected response times are important for estimating the expected work-in-process (WIP) levels at the loading stations for design purposes, and for evaluating the performance of the AMHS as delayed response can impact the production cycle times. The expected response time approximation is validated by comparing the analytical model to the simulation results using a SEMATECH 300 mm hypothetical fab data set.
Keyword:
Markov chains
material handling systems
semiconductor tabs
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Automation Science and Engineering 封面图
IEEE Transactions on Automation Science and Engineering
IF:
6.4
论文数:
5.2K
被引数:
1.6W

机构

暂无机构信息
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
学者 查看更多内容