arrow
返回

Fast gain scheduling on tracking problems using derivative information

delete1997-12-01
delete19
PRE
AI
S
S.-H. Lee
J
Jong Tae Lim *
DOI:10.1016/S0005-1098(97)00154-4delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Current gain scheduling practice is necessarily limited to slow variation in scheduling variables. This paper proposes a control law which reflects the exogenous signal and its time-derivative with assumption of its availability. The proposed controller achieves better performance than the existents for tracking fast scheduling variables while rejecting exogenous signal. (C) 1997 Elsevier Science Ltd. All rights reserved.
Keyword:
fast gain scheduling
scheduling variable
derivative gain
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Automatica 封面图
Automatica
IF:
5.9
论文数:
1.2W
被引数:
5.2W

机构

暂无机构信息
引用论文

引用论文

Fully degenerate poly-Bernoulli numbers and polynomials
err2016-07-26
err0
errOAAI
errTaekyun Kim; Dae San Kim; Jong-Jin Seo
err分享
err收藏
Olfactory Semiochemicals of Tephritids
err2020-03-10
err0
PREAI
errEric B. Jang; Douglas M. Light
err分享
err收藏
err分享
err收藏
没有更多内容