返回
Fast gain scheduling on tracking problems using derivative information
DOI:10.1016/S0005-1098(97)00154-4.png)
摘要
En 中文
Current gain scheduling practice is necessarily limited to slow variation in scheduling variables. This paper proposes a control law which reflects the exogenous signal and its time-derivative with assumption of its availability. The proposed controller achieves better performance than the existents for tracking fast scheduling variables while rejecting exogenous signal. (C) 1997 Elsevier Science Ltd. All rights reserved.
Keyword:
fast gain scheduling
scheduling variable
derivative gain
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
5.9
论文数:
1.2W
被引数:
5.2W
机构
暂无机构信息
引用论文
没有更多内容

