摘要

摘要

En 中文
The Florida Department of Transportation (FDOT) is in the process of implementing Pontis, a Bridge Management System, to provide decision support to engineers in the headquarters and district offices as they make routine policy, programming, and budgeting decisions regarding the preservation and improvement of the state's bridges. As part of this effort, an ongoing research program is underway to adapt the system to FDOT needs as well as to advance the state of the art in several areas important to the Department. Most of the research results are organized around a new project-level decision support framework that complements and builds on Pontis' existing network-level analysis. Specific new models include accident risk and user cost due to roadway width and alignment deficiencies; user cost of load capacity and vertical clearance restrictions, and moveable bridge openings; project-level prediction models for bridge element condition and costs; and prediction of economics of scale and scoping possibilities. The new models are built into a highly graphical spreadsheet model for decision support use.
Keyword:
Florida
State government
Bridges
Information systems
Models
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Journal of Bridge Engineering 封面图
Journal of Bridge Engineering
IF:
3.5
论文数:
2.7K
被引数:
8.8K

机构

F
Florida A&M University
学者数:
1.2K
论文数: 941
被引数: 0
State University System of Florida 封面图
State University System of Florida
学者数:
12.8W
论文数: 10.9W
被引数: 130
引用论文

引用论文

暂无论文信息