返回
Flow-Aware Workload Migration in Data Centers
DOI:10.1007/s10922-018-9452-5.png)
摘要
En 中文
In data centers, subject to workloads with heterogeneous (and sometimes short) lifetimes, workload migration is a way of attaining a more efficient utilization of the underlying physical machines. To not introduce performance degradation, such workload migration must take into account not only machine resources, and per-task resource requirements, but also application dependencies in terms of network communication. This paper presents a workload migration model capturing all of these constraints. A linear programming framework is developed allowing accurate representation of per-task resources requirements and inter-task network demands. Using this, a multi-objective problem is formulated to compute a reallocation of tasks that (1) maximizes the total inter-task throughput, while (2) minimizing the cost incurred by migration and (3) allocating the maximum number of new tasks. A baseline algorithm, solving this multi-objective problem using the epsilon-constraint method is proposed, in order to generate the set of Pareto-optimal solutions. As this algorithm is compute-intensive for large topologies, a heuristic, which computes an approximation of the Pareto front, is then developed, and evaluated on different topologies and with different machine load factors. These evaluations show that the heuristic can provide close-to-optimal solutions, while reducing the solving time by one to two order of magnitudes.
Keyword:
Data center networking
VM migration
Application-aware allocation
MILP
Multi-objective optimization
Pareto optimality
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
3.9
论文数:
1.0K
被引数:
1.3K

