Frequency Response Constrained Modified Interval Scheduling Under Wind Uncertainty

delete2018-01-01
delete36
PRE
AI
V
Vivek Prakash
K
Kailash Chand Sharma
R
Rohit Bhakar *
F
Furong Li
DOI:10.1109/TSTE.2017.2731941delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Large wind generation in existing power system increases the requirement of frequency response (FR) services, as the existing wind generators are weak in providing inertial and primary FR (PFR). This necessitates optimal PFR schedules from unit commitment (UC). PFR constrains have been considered in Stochastic UC problem. However, the simulation process is computationally demanding and necessitates a modeling technique with minimal computational burden, to optimize generation and PFR schedules simultaneously, considering wind uncertainty. This paper proposes computationally fast modified interval UC (MIUC) model to minimize the generation scheduling cost and optimize PFR. Uncertainty is modeled using upper and lower limit, while ramp requirements of consecutive hours depend on the net load scenarios. Case studies are carried out on a single area IEEE RTS; comparative analysis with stochastic scheduling technique show that the proposed method can drastically reduce the simulation time, while offering similar level of operating PFR cost, and PFR schedules, thus addressing wind uncertainty at different penetration level adequately. Further, the proposed model has the potential to offer solutions within acceptable operational time frames for the PFR ancillary service market clearing and dispatch for future low carbon systems.
Keyword:
Frequency response
stochastic scheduling
system inertia
uncertainty
unit commitment
wind generation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Energy Conversion 封面图
IEEE Transactions on Energy Conversion
IF:
5.4
论文数:
6.8K
被引数:
1.5W

机构

M
malaviya national institute of technology jaipur
学者数:
1.3K
论文数: 1.3K
被引数: 2
N
national institute of technology (nit system)
学者数:
4.0W
论文数: 3.7W
被引数: 31
B
Banasthali Vidyapith
学者数:
986
论文数: 784
被引数: 2
学者 查看更多机构
引用论文

引用论文

Tomosyn Inhibits Synaptic Vesicle Priming in Caenorhabditis elegans
err2006-07-25
err0
errOAAI
errElena O Gracheva; Anna O Burdina; Andrea M Holgado; Martine Berthelot-Grosjean; Brian D Ackley; Gayla Hadwiger; Michael L Nonet; Robby M Weimer; Janet E Richmond
err分享
err收藏
Cloning and Functional Analysis of the pbr Lead Resistance Determinant of Ralstonia metallidurans CH34
err2001-10-01
err0
errOAAI
errB. Borremans; J. L. Hobman; A. Provoost; N. L. Brown; D. van der Lelie
err分享
err收藏
How much wind energy will be curtailed on the 2020 Irish power system?
err2013-07-01
err97
errOAAI
errMc Garrigle, E. V.; Deane, J. P.; Leahy, P. G.
err分享
err收藏
Toward Cost-Efficient and Reliable Unit Commitment Under Uncertainty
err2016-03-01
err117
PREAI
errPandzic, Hrvoje; Dvorkin, Yury; Qiu, Ting; Wang, Yishen; Kirschen, Daniel S.
err分享
err收藏
Frequency Control in Autonomous Power Systems With High Wind Power Penetration高风电渗透率下自主电力系统的频率控制
err2012-04-01
err350
PREAI
errMargaris, Ioannis D.; Papathanassiou, Stavros A.; Hatziargyriou, Nikos D.; Hansen, Anca D.; Sorensen, Poul
err分享
err收藏
学者 查看更多内容