arrow
返回

Fuzzy based fast dynamic programming solution of unit commitment with ramp constraints

delete2009-09-02
delete4
delete
OA
AI
S
Suravi Patra *
S
S. Goswami
B
Barnali Goswami
DOI:10.1111/j.1468-0394.2009.00495.xdelete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
A fast dynamic programming technique based on a fuzzy based unit selection procedure is proposed in this paper for the solution of the unit commitment problem with ramp constraints. The curse of dimensionality of the dynamic programming technique is eliminated by minimizing the number of prospective solution paths to be stored at each stage of the search procedure. Heuristics like priority ordering of the units, unit grouping, fast economic dispatch based on priority ordering, and avoidance of repeated economic dispatch through memory action have been employed to make the algorithm fast. The proposed method produced comparable results with the best performing methods found in the literature.
Keyword:
dynamic programming
unit commitment problem
heuristic procedures
fuzzy based unit selection
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Expert Systems 封面图
Expert Systems
IF:
2.3
论文数:
2.6K
被引数:
3.8K

机构

J
Jadavpur University
学者数:
7.0K
论文数: 6.4K
被引数: 5.8K
A
assam engineering college
学者数:
64
论文数: 43
被引数: 0
引用论文

引用论文

err分享
err收藏
err分享
err收藏
A genetic algorithm solution to the unit commitment problem
err1996-01-01
err944
PREAI
errKazarlis, SA; Bakirtzis, AG; Petridis, V
err分享
err收藏
err分享
err收藏
A fast technique for unit commitment problem by extended priority list
err2003-05-01
err346
PREAI
errSenjyu, T; Shimabukuro, K; Uezato, K; Funabashi, T
err分享
err收藏
A fuzzy logic approach to unit commitment
err1997-05-01
err97
PREAI
errSaneifard, S; Prasad, NR; Smolleck, HA
err分享
err收藏
Human erythroid porphobilinogen deaminase exists in 2 splice variants
err2001-02-01
err0
PREAI
errAlexander N. Gubin; Jeffery L. Miller
err分享
err收藏
学者 查看更多内容