arrow
返回

Fuzzy priority heuristics for project scheduling

delete1996-11-01
delete111
PRE
AI
M
Maciej Hapke
R
Roman Słowiński
DOI:10.1016/0165-0114(95)00338-Xdelete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper presents a generalization of the known priority heuristic method for solving resource-constrained project scheduling problems (RCPS) with uncertain time parameters. The generalization consists of handling fuzzy time parameters instead of crisp ones. In order to create priority lists, a fuzzy ordering procedure has been proposed. The serial and parallel scheduling procedures which usually operate on these lists have also been extended to handle fuzzy time parameters. The performance of the method is presented on an example problem.
Keyword:
project scheduling
heuristics
priority rules
fuzzy scheduling procedure
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Fuzzy Sets and Systems 封面图
Fuzzy Sets and Systems
IF:
2.7
论文数:
7.6K
被引数:
1.5W

机构

暂无机构信息
引用论文

引用论文

Eph Receptors and Ephrin Ligands: Important Players in Angiogenesis and Tumor Angiogenesis
err2010-01-01
err0
errOAAI
errBirgit Mosch; Bettina Reissenweber; Christin Neuber; Jens Pietzsch
err分享
err收藏
err分享
err收藏
Combined surface Brillouin scattering and x-ray reflectivity characterization of thin metallic films
err1997-01-15
err0
errOAAI
errM. G. Beghi; C. E. Bottani; P. M. Ossi; T. A. Lafford; B. K. Tanner
err分享
err收藏
Fenofibrate induces G0/G1 phase arrest by modulating the PPARα/FoxO1/p27kip pathway in human glioblastoma cells
err2015-01-08
err0
PREAI
errDong-feng Han; Jun-xia Zhang; Wen-jin Wei; Tao Tao; Qi Hu; Ying-yi Wang; Xie-feng Wang; Ning Liu; Yong-ping You
err分享
err收藏
err分享
err收藏
没有更多内容