返回
Fuzzy priority heuristics for project scheduling
DOI:10.1016/0165-0114(95)00338-X.png)
摘要
En 中文
This paper presents a generalization of the known priority heuristic method for solving resource-constrained project scheduling problems (RCPS) with uncertain time parameters. The generalization consists of handling fuzzy time parameters instead of crisp ones. In order to create priority lists, a fuzzy ordering procedure has been proposed. The serial and parallel scheduling procedures which usually operate on these lists have also been extended to handle fuzzy time parameters. The performance of the method is presented on an example problem.
Keyword:
project scheduling
heuristics
priority rules
fuzzy scheduling procedure
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
2.7
论文数:
7.6K
被引数:
1.5W
机构
暂无机构信息
引用论文
Combined surface Brillouin scattering and x-ray reflectivity characterization of thin metallic films
没有更多内容

