arrow
返回

Fuzzy-probabilistic PERT

delete2016-09-29
delete11
PRE
AI
B
Barbara Gładysz *
DOI:10.1007/s10479-016-2315-0delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Using PERT (Program evaluation and review technique), one assumes that the time required to carry out the individual tasks in a project can be approximated using a beta distribution. It is assumed that the parameters of these distributions (the minimum, maximum and most likely times) are estimated by experts in accordance with the properties of the beta distribution. However, this is not always the case. This article shows how one may analyse the time required to carry out a task. Two approaches to describing uncertainty regarding the duration of tasks are used: probabilistic and fuzzy. This article proposes a mixture of a beta probability distribution with a generative probability distribution to describe the duration of a task. An illustrative examples are given.
Keyword:
Project
Duration of a task
Fuzzy variable
Mixed probability distribution
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Annals of Operations Research 封面图
Annals of Operations Research
IF:
4.5
论文数:
8.0K
被引数:
2.1W

机构

W
wroclaw university of science & technology
学者数:
7.4K
论文数: 7.1K
被引数: 2
引用论文

引用论文

Proposal of a new distribution in PERT methodology
err2010-09-03
err11
PREAI
errGarcia Garcia, Catalina Beatriz; Garcia Perez, Jose; Cruz Rambaud, Salvador
err分享
err收藏
Hybrid (fuzzy-stochastic) modelling in construction operations management
err2012-05-04
err6
PREAI
errChrysafis, Konstantinos A.; Panagiotakopoulos, Demetrios; Papadopoulos, Basil K.
err分享
err收藏
err分享
err收藏
Revisiting the PERT mean and variance
err2011-04-01
err27
PREAI
errManuel Herrerias-Velasco, Jose; Herrerias-Pleguezuelo, Rafael; Rene van Dorp, Johan
err分享
err收藏
Congenital hairy polyp of the soft palate
err2012-01-01
err0
PREAI
errMehmet Yilmaz; Metin Ibrahimov; Ozcan Ozturk; Emin Karaman; Mehmet Aslan
err分享
err收藏
学者 查看更多内容