Results are reported from tests of three precast, prestressed concrete girders under fatigue-type cyclic and monotonic loading conducted after deck removal and replacement. Although deck demolition altered the top surface of the girders, the girder-deck interfaces exhibited shear strengths greater than their nominal strength (based on the 2012 AASHTO LRFD Specification) after 2x10(6) cycles of loading to 45 and 30% of their nominal strength for troweled and roughened interfaces, respectively. A partially debonded detail was used for two of the girders to protect the girder top flange, which was wide and thin, during deck demolition. The roofing felt used to debond the girder-deck interface over the flanges reduced the effort required for deck removal by 65%, compared with the typical detail, eliminated chipping hammer-induced damage to the girder flanges, and still resulted in sustained composite action under 2x10(6) cycles of loading. The width of the bonded interface had little effect on girder stiffness and no observed effect on the width of deck effective in bending.
Keyword:
STRENGTH
SHEAR
BEAMS
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
3.5
论文数:
2.7K
被引数:
8.8K