摘要

En 中文
Increasing global energy consumption, large variations in its cost and the environmental degradation effects are good reasons for the manufacturing industries to become greener. Green shop floor scheduling is increasingly becoming a vital factor in the sustainable manufacturing. In this paper, a green permutation flowshop scheduling problem with sequence-dependent setup times is studied. Two objectives are considered including minimisation of makespan as a measure of service level and minimisation of total energy consumption as a measure of environmental sustainability. We extend a bi-objective mixed-integer linear programming model to formulate the stated problem. We develop a constructive heuristic algorithm to solve the model. The constructive heuristic algorithm includes iterated greedy (CHIG) and local search (CHLS) algorithms. We develop an efficient energy-saving method which decreases energy consumption, on average, by about 15%. To evaluate the effectiveness of the constructive heuristic algorithm, we compare it with the famous augmented epsilon-constraint method using various small-sized and large-sized problems. The results confirm that the heuristic algorithm obtains high-quality non-dominated solutions in comparison with the augmented epsilon-constraint method. Also, they show that the CHIG outperforms the CHLS. Finally, this paper follows a case-study, with in-depth analysis of the model and the constructive heuristic algorithm.
Keyword:
green manufacturing
energy consumption
constructive heuristic
sequence-dependent setup times
flowshop scheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

K
K. N. Toosi University of Technology
学者数:
5.3K
论文数: 5.1K
被引数: 3
引用论文

引用论文

err分享
err收藏
Primary repair with suture augmentation for proximal anterior cruciate ligament tears: A systematic review with meta-analysis
err2022-10-01
err0
PREAI
errHarmen D. Vermeijden; Jelle P. van der List; Joyce L. Benner; Maarten V. Rademakers; Gino M.M.J. Kerkhoffs; Gregory S. DiFelice
err分享
err收藏
学者 查看更多内容