arrow
返回

Heuristic procedures for the parallel machine problem with tool switches

delete2002-01-01
delete29
PRE
AI
Y
Yahya Fathi *
K
K. W. Barnette
DOI:10.1080/00207540110076115delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
We address the problem of scheduling a set of parts with given processing times and tool requirements on m identical parallel machines. The problem is to find an allocation of the machines to the parts, a proper sequence for the parts assigned to each machine, and a corresponding tool-switching plan for each machine so as to minimize the makespan. It is demonstrated that this problem is np-hard, and three heuristic procedures are proposed for solving it. The first procedure is a multi-start local improvement procedure, and various neighborhood structures and search strategies are discussed in this context. The second procedure is a variation of the list-processing routine that is commonly used for the parallel machine problem. Finally, the last procedure is an adaptation of a well-known constructive procedure for the k-travelling salesman problem. Results of a limited computational experiment are also presented in which the makespan obtained via each heuristic procedure is compared with a proposed lower bound and with other reference values.
Keyword:
NUMBER
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏
Genetic group×ambient temperature interaction effects on physiological responses and growth performance of rabbits
err2011-09-01
err0
errOAAI
errC.P. Zeferino; A.S.A.M.T. Moura; S. Fernandes; J.S. Kanayama; C. Scapinello; J.R. Sartori
err分享
err收藏