Hydro unit commitment and loading problem for day-ahead operation planning problem

delete2013-01-01
delete67
PRE
AI
E
Erlon Cristian Finardi
M
Murilo Reolon Scuzziato *
DOI:10.1016/j.ijepes.2012.07.023delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
We describe a new model for the hydro unit commitment and loading (HUCL) problem that has been developed to be used as a support tool for day-ahead operation in the Brazilian system. The objective is to determine the optimal unit commitment and generation schedules for cascaded plants with multiple units and a head-dependent hydropower model. In this paper, we propose a new mathematical model for the hydropower function where the mechanical and electrical losses in the turbine-generator are included. We model the HUCL problem as a nonlinear mixed 0-1 programming problem and solve it with a strategy that includes a two-phase approach based on dual decomposition. The computational tool allows the model to effectively schedule hydro units for the problem in the Brazilian regulatory framework. Application of the approach is demonstrated by determining a 24-time step HUCL schedule for four cascaded plants with 4170 MW of installed capacity. (C) 2012 Elsevier Ltd. All rights reserved.
Keyword:
Hydro unit commitment and loading problem
Hydropower function
Lagrangian relaxation
Inexact Augmented Lagrangian

期刊

I
International Journal of Electrical Power and Energy Systems
IF:
5
论文数:
1.1W
被引数:
3.1W

机构

U
universidade federal de santa catarina (ufsc)
学者数:
1.5W
论文数: 1.1W
被引数: 9
引用论文

引用论文

Optimized 3 T EPI of the amygdalae
err2004-05-01
err0
PREAI
errS Robinson; C Windischberger; A Rauscher; E Moser
err分享
err收藏
Self-scheduling of a hydro producer in a pool-based electricity market
err2002-11-01
err295
PREAI
errConejo, AJ; Arroyo, JM; Contreras, J; Villamor, FA
err分享
err收藏
学者 查看更多内容