Hydrothermal scheduling in the continuous-time framework
DOI:10.1016/j.epsr.2020.106787.png)
摘要
En 中文
Continuous-time optimization models have successfully been used to capture the impact of ramping limitations in power systems. In this paper, the continuous-time framework is adapted to model flexible hydropower resources interacting with slow-ramping thermal generators to minimize the hydrothermal system cost of operation. To accurately represent the non-linear hydropower production function with forbidden production zones, binary variables must be used when linearizing the discharge variables and the continuity constraints on individual hydropower units must be relaxed. To demonstrate the performance of the proposed continuous-time hydrothermal model, a small-scale case study of a hydropower area connected to a thermal area through a controllable high-voltage direct current (HVDC) cable is presented. Results show how the flexibility of the hydropower can reduce the need for ramping by thermal units triggered by intermittent renewable power generation. A reduction of 34% of the structural imbalances in the system is achieved by using the continuous-time model.
Keyword:
Continuous-time optimization
Hydrothermal scheduling
Structural imbalances
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.2
论文数:
1.2W
被引数:
2.2W
机构
引用论文
A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem用于热单位承诺问题的计算有效的混合整数线性公式