Improved Jaya Algorithm for Flexible Job Shop Rescheduling Problem

delete2020-01-01
delete19
delete
OA
AI
K
Kaizhou Gao
阳
阳发军 (Fajun Yang) *
李
李俊青 (Junqing Li)
桑红燕 封面图
桑红燕 (Hongyan Sang)
J
Jianping Luo
DOI:10.1109/ACCESS.2020.2992478delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Machine recovery is met from time to time in real-life production. Rescheduling is often a necessary procedure to cope with it. Its instability gauges the number of changes to the existing scheduling solutions. It is a key criterion to measure a rescheduling solution & x2019;s quality. This work aims at solving a flexible job shop problem with machine recovery, which arises from the scheduling and rescheduling of pump remanufacturing systems. In their scheduling phase, the objective is to minimize makespan. In their rescheduling phase, two objectives are to minimize both instability and makespan. By introducing two novel local search operators into the original Jaya algorithm, this work proposes an improved Jaya algorithm to solve it. It performs experiments on ten different-scale cases of real-life remanufacturing environment. The results show that the improved Jaya is effective and efficient for solving a flexible job shop scheduling and rescheduling problems. It can effectively balance instability and makespan in a rescheduling phase.
Keyword:
Jaya algorithm
flexible job shop scheduling
machine recovery
remanufacturing
scheduling and rescheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Access 封面图
IEEE Access
IF:
3.6
论文数:
9.8W
被引数:
29.4W

机构

F
fern university hagen
学者数:
639
论文数: 640
被引数: 0
L
Liaocheng University
学者数:
7.8K
论文数: 6.1K
被引数: 8.8K
S
shenzhen university
学者数:
4.6W
论文数: 3.4W
被引数: 72
学者 查看更多机构
引用论文

引用论文

err分享
err收藏
Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns
err2017-10-01
err96
PREAI
errNouiri, Maroua; Bekrar, Abdelghani; Jemai, Abderrazak; Trentesaux, Damien; Ammari, Ahmed Chiheb; Niar, Smail
err分享
err收藏
A Prediction Model-Guided Jaya Algorithm for the PV System Maximum Power Point Tracking
err2018-01-01
err160
PREAI
errHuang, Chao; Wang, Long; Yeung, Ryan Shun-Cheung; Zhang, Zijun; Chung, Henry Shu-Hung; Bensoussan, Alain
err分享
err收藏
Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
err2019-05-01
err236
errOAAI
errGao, Kaizhou; Yang, Fajun; Zhou, MengChu; Pan, Quanke; Suganthan, Ponnuthurai Nagaratnam
err分享
err收藏
TTSA: An Effective Scheduling Approach for Delay Bounded Tasks in Hybrid Clouds
err2017-11-01
err157
PREAI
errYuan, Haitao; Bi, Jing; Tan, Wei; Zhou, MengChu; Li, Bo Hu; Li, Jianqiang
err分享
err收藏