Optimization problems in construction scheduling, such as time-cost optimization, can be effectively solved using genetic algorithms (GAs). This paper presents an approach that makes GA-based time-cost optimization viable for real world problems. Practicability is incorporated through the integration of a project management system to the GA system. The approach takes advantage of the powerful scheduling functionality of the project management system in evaluating project completion dates during optimization. The approach ensures that all scheduling parameters, including activity relationships, lags, calendars, constraints, resources, and progress, are considered in determining the project completion date, thus allowing comprehensive and realistic evaluations to be made during optimization.
Keyword:
optimization
scheduling
construction management
algorithms
project management
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

暂无机构信息
引用论文

引用论文