arrow
返回

Incremental network design with maximum flows

delete2015-04-01
delete44
delete
OA
AI
T
Thomas Kalinowski *
D
Dmytro Matsypura
M
Martin Savelsbergh
DOI:10.1016/j.ejor.2014.10.003delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
We study an incremental network design problem, where in each time period of the planning horizon an arc can be added to the network and a maximum flow problem is solved, and where the objective is to maximize the cumulative flow over the entire planning horizon. After presenting two mixed integer programming (MIP) formulations for this NP-complete problem, we describe several heuristics and prove performance bounds for some special cases. In a series of computational experiments, we compare the performance of the MIP formulations as well as the heuristics. (C) 2014 Elsevier B.V. All rights reserved.
Keyword:
Network design
Approximation algorithms
Scheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

U
University of Sydney
学者数:
6.5W
论文数: 6.2W
被引数: 90
U
university system of georgia
学者数:
7.3W
论文数: 6.6W
被引数: 101
U
University of Newcastle
学者数:
1.5W
论文数: 1.5W
被引数: 16
学者 查看更多机构
引用论文

引用论文

Incremental network design with shortest paths具有最短路径的增量网络设计
err2014-11-01
err47
errOAAI
errBaxter, Matthew; Elgindy, Tarek; Ernst, Andreas T.; Kalinowski, Thomas; Savelsbergh, Martin W. P.
err分享
err收藏
err分享
err收藏
GPR anomaly detection with robust principal component analysis
err2015-05-21
err0
PREAI
errMatthew P. Masarik; Joseph Burns; Brian T. Thelen; Jack Kelly; Timothy C. Havens
err分享
err收藏
没有更多内容