This paper tries to analyze common bridge construction defects, classify them into appropriate groups, and redefine them as a precautionary measure and means to improve quality in bridge construction. For this purpose, data on bridge construction since January 2007 were obtained from the evaluation report of the Public Construction Committee (PCC) of Taiwan. Bridge construction defects were classified according to their characteristics. A constraint-based clustering method and affinity diagram (KJ method) are proposed and used. This method can simultaneously treat mixed data types; moreover, it can incorporate user-specified constraints. The quality or safety issues, the unit-in-charge (Government authorities/project owners/contractor), and the properties of the defects (construction/audit/documents/others) are the sorting attributes. The constraint is avoiding empty clusters or clusters having very few objects. The results revealed five major defect classifications: safety and environment, construction site defects, supervision/control process, construction quality documents, and others. (C) 2010 Elsevier Ltd. All rights reserved.
Keyword:
Affinity diagram
Bridge construction
Constraint-based clustering
kJ method
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.5
论文数:
3.0W
被引数:
10.2W
机构
引用论文
Constraint-based clustering model for determining contract packages of bridge maintenance inspection