Return
Integration optimization of commuter metro lines: train timetable, passenger flow control strategy and short turning scheme
F
H
C
W
DOI:10.1016/j.cie.2025.111768.png)
Abstract
En 中文
• Optimize train timetable, passenger control and short turning schedule integrated. • The detailed passenger flow control strategy is obtained. • Verify the proposed model through Beijing Metro Line 5. • Short turning plans can effectively reduce the operational costs.
Journal
IF:
6.5
Papers:
1.0W
Citations:
3.8W
