Inter-phase feedbacks in construction projects
DOI:10.1016/j.jom.2015.07.005.png)
摘要
En 中文
Understanding diverse performance trajectories of projects is of interest to operations researchers and practitioners. Interactions between multiple phases of a project are commonly assumed to be important in project dynamics, yet the strength of these feedback mechanisms has not been rigorously evaluated. In this study we use data from 15 construction projects to estimate the feedbacks between design and construction phases. The estimated factors reveal that undiscovered design rework diminishes construction quality and production rate significantly and construction completion speeds up the detection of undiscovered design rework. Together, these feedbacks can explain as much as 20% of variability in overall project costs. Comparison of model predictions with a separate set of 15 projects shows good predictive power for cost and schedule outcomes and their uncertainty. The estimation and prediction framework offers a template for using data from multiple cases to estimate both case-specific and industry-wide parameters of project models, and for leveraging those estimates for project planning. (C) 2015 Elsevier B.V. All rights reserved.
Keyword:
Project management
Feedback
Construction
Design
System dynamics
Estimation
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
10.4
论文数:
1.7K
被引数:
1.5W
机构
引用论文
Personality pace-of-life hypothesis: testing genetic associations among personality and life history