Interface-Management Process for Managing Risks in Complex Capital Projects
DOI:10.1061/(ASCE)CO.1943-7862.0000990.png)
摘要
En 中文
Extremely large, complex projects with numerous geographically distributed stakeholders experience substantial risks related to the interfaces among stakeholders. This is particularly true during project definition and design, where despite discrete deliverables across the interfaces, decisions require some iteration. Managing interfaces has become feasible with the advent of internet and electronic product and process-management systems to the extent that full-time interface-management (IM) positions exist in practice. However, IM lacks formal structure, integration with critical-path-method scheduling, and methods to identify high-risk interface points (IPs). Throughout this paper, a graph-based algorithm is developed to identify key IPs in the network of IPs in a capital project. Furthermore, a new approach is discussed to link the key IPs to the interface milestones to identify schedule-related risks and mitigate their adverse impact. The functionality of the proposed algorithms is demonstrated in an offshore model project. The contributions of this paper provide foundational material for further research in IM. (C) 2015 American Society of Civil Engineers.
Keyword:
Interface management
Construction management
Capital projects
Project planning and design
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
引用论文
Gender and Handedness Prediction from Offline Handwriting Using Convolutional Neural Networks
Complexity
IF0
Pore Space Deformation and Its Implications for Two‐Phase Flow Through Porous Media: A Micro‐Scale Experimental Investigation孔隙变形及其对多孔介质中两相流的影响:一项微尺度实验研究
How simplifying capillary effects can affect the traveling wave solution profiles of the foam flow in porous media简化毛细效应对多孔介质中泡沫流传播波解轮廓的影响