arrow
返回

Isomorphic scheduling problems

delete2012-09-19
delete13
PRE
AI
S
Stanisław Gawiejnowicz *
A
Alexander Kononov
DOI:10.1007/s10479-012-1222-2delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
We consider general properties of isomorphic scheduling problems that constitute a new class of pairs of mutually related scheduling problems. Any such a pair is composed of a scheduling problem with fixed job processing times and its time-dependent counterpart with processing times that are proportional-linear functions of the job starting times. In order to introduce the class formally, first we formulate a generic scheduling problem with fixed job processing times and define isomorphic problems by a one-to-one transformation of instances of the generic problem into instances of time-dependent scheduling problems with proportional-linear job processing times. Next, we prove basic properties of isomorphic scheduling problems and show how to convert polynomial algorithms for scheduling problems with fixed job processing times into polynomial algorithms for proportional-linear counterparts of the original problems. Finally, we show how are related approximation algorithms for isomorphic problems. Applying the results, we establish new worst-case results for time-dependent parallel-machine scheduling problems and prove that many single- and dedicated-machine time-dependent scheduling problems with proportional-linear job processing times are polynomially solvable.
Keyword:
Scheduling
Deteriorating jobs
Single machine
Parallel machines
Dedicated machines
Polynomial algorithms
Approximation algorithms
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Annals of Operations Research 封面图
Annals of Operations Research
IF:
4.5
论文数:
8.2K
被引数:
2.5W

机构

A
Adam Mickiewicz University
学者数:
279
论文数: 124
被引数: 3.1K
R
Russian Academy of Sciences
学者数:
2.2K
论文数: 706
被引数: 2.0W
引用论文

引用论文

err分享
err收藏
Parameter optimization and real-time calibration of a measurement-device-independent quantum key distribution network based on a back propagation artificial neural network
err2019-02-12
err0
errOAAI
errFeng-Yu Lu; Zhen-Qiang Yin; Chao Wang; Chao-Han Cui; Jun Teng; Shuang Wang; Wei Chen; Wei Huang; Bing-Jie Xu; Guang-Can Guo; Zheng-Fu Han
err分享
err收藏
err分享
err收藏
Therapeutic Angiogenesis in Critical Limb and Myocardial Ischemia
err2007-06-08
err0
PREAI
errPETER R. VALE; JEFFREY M. ISNER; KENNETH ROSENFIELD
err分享
err收藏
Scheduling time-dependent jobs under mixed deterioration
err2010-03-01
err24
PREAI
errGawiejnowicz, Stanislaw; Lin, Bertrand M. T.
err分享
err收藏
Equivalent time-dependent scheduling problems
err2009-08-01
err16
PREAI
errGawiejnowicz, Stanislaw; Kurc, Wieslaw; Pankowska, Lidia
err分享
err收藏
学者 查看更多内容