Issues in estimating real-time data communications software projects
DOI:10.1016/S0950-5849(96)00004-3.png)
摘要
En 中文
The estimation of development effort and time is difficult for demanding real-time data communications software projects, where rapid response rates are critical in machine-machine communications. Applying popular cost models to estimate cost and time in three real-time data communications development projects showed that the development effort predictions varied from overestimation by a factor of 515 to an underestimation by a factor of 0.06, These results indicate that current cost estimation models may not be appropriate in estimating development effort for such software, Based on the distinctive features of data communications software projects, suggestions are made to modify the parameters of the function point model. Future research is essential to develop a more accurate model for these software projects. (C) 1997 Elsevier Science B.V.
Keyword:
real-time
data communications
Cost Estimation Models
function point model
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.3
论文数:
3.8K
被引数:
7.7K
机构
暂无机构信息
引用论文
Association between Proliferative Diabetic Retinopathy and Serum Bile Acid Level in Patients with Type 2 Diabetes Mellitus2型糖尿病 mellitus患者中增生性糖尿病视网膜病变与血清胆汁酸水平的关联
Extraordinarily high plastic deformation in polyurethane/silica nanoparticle nanocomposites with low filler concentrations
Polymer
IF0
没有更多内容