arrow
返回

Knowledge-Based Approach for Reservoir System Optimization

delete2014-06-01
delete12
PRE
AI
X
Xiang Li
魏
魏加华 (Jiahua Wei) *
傅
傅旭东 (Xudong Fu)
T
Tiejian Li
G
Guangqian Wang
DOI:10.1061/(ASCE)WR.1943-5452.0000379delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper addresses a knowledge-based approach for reservoir system optimization. The approach takes a more detailed consideration of each turbine in a hydropower plant than the traditional constant output coefficient method. To use this approach, a knowledge expression and a knowledge function are defined for hydropower plant operation. The knowledge expression is extracted by dynamic programming to save all possibly optimal situations of unit commitment, and further, the knowledge function is formulated based on a two-dimensional interpolation of the knowledge expression. Through the use of the knowledge expression and the knowledge function, computer memory requirements can be reduced and unnecessary computations can be avoided in the reservoir operation optimization. To overcome the decomposition schemes in time and in space and guarantee finding the global optimum (in a discrete sense) with an extended time horizon, up to 400 CPU cores are used to run a parallel dynamic programming model, which applies the knowledge-based approach, to estimate the maximum energy production of the Three Gorges Project (TGP) and the Gezhouba Project (GZB) cascade hydropower plants in China in the year of 2010, with 1 day as the time step and 365 days as the time horizon. The case study results show that the maximum energy production of the TGP-GZB system would be 1,035.0 x 10(8) kWh in 2010 under the current operating rules. Thus, there is still room for improvement in energy production, with the maximum increase of 1.83% (18.3 x 10(8) kWh) from optimizing hydropower plant operation and 3.46% (34.6 x 10(8) kWh) from optimizing both hydropower plant operation and reservoir operation. The overall approach is effective in providing optimal assessment solutions with an acceptable computation time. Thus, it can be concluded that the approach can be applied for planning purposes or providing more reasonable boundaries for real-time operation. (C) 2014 American Society of Civil Engineers.
Keyword:
Knowledge-based approach
Hydropower plant operation
Reservoir operation
Parallel dynamic programming model
Three Gorges project and Gezhouba project cascade hydropower plants
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Water Resources Management 封面图
Water Resources Management
IF:
4.7
论文数:
8.1K
被引数:
1.6W

机构

T
tsinghua university
学者数:
11.9W
论文数: 10.0W
被引数: 137
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
err分享
err收藏
TEICOPLANIN-INDUCED OTOTOXICITY IN DOWN'S SYNDROME
err1986-03-01
err0
PREAI
errE.R. Maher; A. Hollman; R.N. Grüneberg
err分享
err收藏
err分享
err收藏
Fullerenes make copper catalysis better
err2022-04-15
err0
PREAI
errEdmond Gravel; Eric Doris
err分享
err收藏
Analyses of the energy-size reduction of mixtures of narrowly sized coals in a ball-and-race mill
err2018-06-01
err0
PREAI
errXiaolu Sun; Weining Xie; Yaqun He; Hong Li; Shuai Wang; Xiangnan Zhu
err分享
err收藏
Optimization of large-scale hydropower system operations
err2003-05-01
err240
PREAI
errBarros, MTL; Tsai, FTC; Yang, SL; Lopes, JEG; Yeh, WWG
err分享
err收藏
学者 查看更多内容