Knowledge-based schedule generation and evaluation

delete2010-11-01
delete62
PRE
AI
E
Eva Mikulakova *
M
Markus König
E
Eike Tauscher
K
Karl Beucke
DOI:10.1016/j.aei.2010.06.010delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The straightforward and effective realization of construction projects is heavily dependent upon the planning of the construction process and the response to project modifications during the construction phase Construction-process planning is one of the most important requirements for a satisfactory result, but it is often not given sufficient consideration. The construction planning usually involves great amount of process steps and is developed by the processing of many project participants The construction-planning steps range from planning of building design and creation of construction drawings up to the generation of schedules for the realization of the planned building. These steps are often executed without overall coordination and reiteratively The planning process becomes error prone and thus results in inaccurate schedules. The planned construction process must then be operational adapted at the construction site These drawbacks are mainly produced during the manual creation of schedules that is based on no current or insufficient information. Moreover, due to the complexity of the planning task in the domain of construction planning the manually generated schedules are often imprecise Furthermore, schedules are not updated when project conditions change. In such situations, project managers balance the available possibilities and intuitively choose one construction alternative for the realization During this process many factors are often taken into account insufficiently or not at all In addition, the project managers are wasting their resources generating new schedules for recurring situations that are similar to already executed projects In consequence, the project experience becomes personal and is not available for other project participants. To eliminate these drawbacks, a knowledge-based approach for the automatic generation of schedules and their evaluation is presented in this paper using the building information for identification of the scheduling subject. With the support of the system, construction schedules can moreover be re-generated flexibly, each time a project is modified, considering the current execution alternatives. All learned experience is stored within a reasoning system for further reuse. Using a decision-support system, construction alternatives can be evaluated considering all relevant factors and the best alternative for the realization can be proposed. (C) 2010 Elsevier Ltd All rights reserved
Keyword:
Automated scheduling
Case-Based Reasoning (CBR)
Construction alternative
Building information
Industry Foundation Classes (IFC)
Schedule evaluation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Advanced Engineering Informatics 封面图
Advanced Engineering Informatics
IF:
9.9
论文数:
4.1K
被引数:
1.7W

机构

B
bauhaus-universitat weimar
学者数:
783
论文数: 921
被引数: 4
R
ruhr university bochum
学者数:
2.3W
论文数: 1.9W
被引数: 14
引用论文

引用论文

Total Serum Magnesium Levels and Calcium-To-Magnesium Ratio in Sickle Cell Disease
err2019-08-29
err0
errOAAI
errCharles Antwi-Boasiako; Yaw A. Kusi-Mensah; Charles Hayfron-Benjamin; Robert Aryee; Gifty Boatemaah Dankwah; Lim Abla Kwawukume; Ebenezer Owusu Darkwa
err分享
err收藏
Fuzzy sets模糊集
err1965-06-01
err0
errOAAI
errL.A. Zadeh
err分享
err收藏
MASS SOCIOGENIC ILLNESS BY PROXY: PARENTALLY REPORTED EPIDEMIC IN AN ELEMENTARY SCHOOL
err1989-12-01
err0
PREAI
errRossanneM. Philen; ThomasW. Mckinley; EdwinM. Kilbourne; R.Gibson Parrish
err分享
err收藏
err分享
err收藏
Distributed spectral cluster management
err2012-07-16
err0
errOAAI
errMuhammad Adnan Tariq; Boris Koldehofe; Gerald G. Koch; Kurt Rothermel
err分享
err收藏
学者 查看更多内容