arrow
返回

Laboratory scaled third rail deicing comparative test

delete2020-06-01
delete1
delete
OA
AI
J
Jean-Denis Brassard *
É
Éric Villeneuve
C
C. Volat
DOI:10.1016/j.rineng.2020.100132delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
The train transportation networks in northern countries are, during winter, affected by the frozen and freezing precipitations. The most affected part is the conductive rail denoted as the third rail. Although the two other rails are easily deiced, the third rail is only in contact with a conductive shoe that does not give enough force to properly remove the ice. This paper proposes a new comparative test to evaluate the required force to remove the ice on a scaled down rail under controlled conditions in a cold room. Experimentations have been performed under simulated freezing drizzle at -10 degrees C on a steel rail bare and covered with protection coatings or fluids. The results obtained have proven the efficiency of the test method for the comparison, the classification and the selection of the best candidate products for outdoor test campaigns.
Keyword:
Icing
Rails
Deicing chemical
Ice
Winter
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Results in Engineering 封面图
Results in Engineering
IF:
7.9
论文数:
1.2W
被引数:
1.7W

机构

U
university of quebec
学者数:
2.0W
论文数: 1.9W
被引数: 19
引用论文

引用论文

暂无论文信息